Containment Contracting
  enlarge image
 
Channel Stabilization
Before

This channel was not graded properly and accumulated standing water. The unattractive rip rap and standing water were major concerns for the neighborhood association.

 
 
  enlarge image
 
Channel Stabilization
After

The channel was re-graded to proper grade specifications to eliminate standing water. Two types of erosion control blankets were used to stabilize the channel eliminating the need for rip rap.